For
Refurbishment & New Build Applications
Stabilising solution may be applied if required
to help improve adhesion and offer uniform suction.
Any ridges or protrusions should be removed
and hollows filled to provide a smooth surface.
Attach
base rails & surface profiles.
Apply
recommended adhesive to first EPS insulation board using a grooved trowel.
Apply firm distributed pressure & fix to base rail / substrate.
Continue
with additional boards ensuring that a staggered laying pattern is adhered
to.
Once the boards are firmly in place, carefully rasp the surface
with a sanding tool to ensure a smooth uniform finish.
Secure boards with approved WBS mechanical fixings.
Apply a basecoat of recommended adhesive onto the insulation boards
and bed in alkali resistant reinforcing mesh into the top third of the
thickness, ensuring that an overlap of a minimum of 75mm is achieved.
Apply additional stress patches and corner reinforcements across
all window and door openings at a 45° angle.
Apply WBS primer (colour to match final texture coat) in accordance
with manufacturer’s instructions.
Thoroughly mix the WBS Silicone texture finish to a uniform consistency.
Apply in a continuous motion always working to
a wet edge.
|