COMPLETED PROJECTS - NEW BUILD
 |
|
 |
|
 |
Eco
Properties, Craven Arms |
|
Park
Lane, Croydon |
|
Hamilton
Street, Girvan |
| Construction: |
Timber Frame |
|
Construction: |
Steel Frame |
|
Construction: |
Blockwork |
| Insulation: |
80mm EPS |
|
Insulation: |
80mm EPS &
150mm MW |
|
Insulation: |
50mm PIR |
| Finish: |
1.5mm Silicone K |
|
Finish: |
1.5mm Silicone K & Terracotta
Tiles |
|
Finish: |
WBS Roughcast |
 |
|
 |
|
 |
The
Green Building, Manchester |
|
Newport
Road, Cardiff |
|
Galleons
Reach , Thamesmead |
| Construction: |
Steel Frame & Blockwork
|
|
Construction: |
Steel Frame
|
|
Construction: |
Brick /
Block |
| Insulation: |
90mm MW |
|
Insulation: |
80mm EPS |
|
Insulation: |
80mm EPS |
| Finish: |
1.5mm Silicone R |
|
Finish: |
1.5mm Silicone K |
|
Finish: |
1.5mm Silicone K |
 |
|
 |
|
 |
Private
Beco Wallform, Shaldon |
|
Varco
Rd, London |
|
Great
Suffolk Street, London SE1 |
| Construction: |
BecoWallform |
|
Construction: |
Steel Frame |
|
Construction: |
Steel Frame |
| Insulation: |
BecoWallform EPS |
|
Insulation: |
60mm EPS |
|
Insulation: |
40mm EPS |
| Finish: |
1.5mm Silicone K |
|
Finish: |
1.5mm Silicone K |
|
Finish: |
1.5mm Silicone K &
copper panels at sun facing elevations |
 |
|
|
|
 |
Brighton
Road, Purley |
|
Wandle
Rd, Croydon |
|
Albermarle
House, Beckenham |
| Construction: |
Timber Frame
|
|
Construction: |
Timber Frame
|
|
Construction: |
Steel Frame |
| Insulation: |
30mm EPS |
|
Insulation: |
MW to timber frame cavity &
30mm EPS |
|
Insulation: |
100mm MW |
| Finish: |
1.5mm Silicone K |
|
Finish: |
1.5mm Silicone K |
|
Finish: |
1.5mm Silicone K |
 |
|
 |
|
 |
Thomas
Bennett
Community College |
|
Newbuild
Hospital, Lochgilphead |
|
Oriel
High School, Crawley |
| Construction: |
Steel Frame |
|
Construction: |
Steel Frame |
|
Construction: |
Steel Frame |
| Insulation: |
70mm MW |
|
Insulation: |
50mm PH |
|
Insulation: |
70mm EPS |
| Finish: |
1.5mm Silicone K |
|
Finish: |
1.5mm Silicone K |
|
Finish: |
1.5mm Silicone K |
|
|