Bannatyne Hotel

Due to an extremely tight build schedule, the Architect on this particular project chose to adopt a steel frame solution due to the high speed of construction it afforded.  Similarly, the requirement for a quick build façade system was also necessary to ensure that the building was swiftly deemed watertight. The EPSITEC Insulated Render System, which incorporates a drainage cavity proved to be the perfect solution.

The EPSITEC system was constructed by mechanically fixing a powder coated top hat section to an approved building board, whilst incorporating horizontal and vertical fire breaks at party walls. Deflection beads were also placed over windows allowing any potential water ingress within the cavity to drain to floor level. The mechanical fixing of 90mm Phenolic Insulation also meant that the required ‘U’ value of 0.35 W/m²K was easily achievable.

The final finish consisted of WBS Laguna Brick Slips which were used on the ground floor level to help protect the façade from potential foot traffic impact, whilst the remainder of the building was finished using WBS 1.5mm ‘K’ Silicone Render and a small amount of timber cladding, giving the building a bright, clean finish. Bricks Slips were also used as a feature at window cills and heads on the first and second floors.

Project Type

New Build Hotel - Steel Frame

Client

Bannatyne Hotel Durham

System Installer

Plaslines

Architect

Browne Smith Baker

Partners

ESH Group


0
Connecting
Please wait...
Send a message

Sorry, we aren't online at the moment. Leave a message.

Don't forget to include your location and postcode.

Your name
* Email
* Describe your issue
Login now

Need more help? Save time by starting your support request online.

Your name
* Email
* Describe your issue
We're online!
Feedback

Help us help you better! Feel free to leave us any additional feedback.

How do you rate our support?
Main Number
01942 717 100

Technical Hotline
0800 107 32 99

Samples Hotline
0800 107 32 88